Contract value £390,000
Contract duration 26 weeks
The works comprised of the demolition of the existing building and the design and construction of a steel framed building to create a new vehicle recovery response unit. The works consisted of:
- Piling
- Foundations
- Drainage and services
- Steel structure
- Suspended floor slabs
- Two story office
- General finishes